Quick answer: An OEM apparel order has twelve steps, but only four are decision gates: tech pack sign-off, proto approval, size-set approval and pre-production sample approval. Everything that goes wrong later traces back to one of those four being waved through. The checklist below tells you what to hold at each gate.
This is written for a brand placing a first or second order — usually 300 to 3,000 pieces across two or three styles — with a manufacturer in Guangzhou or elsewhere in southern China. It assumes you have a design idea and no established process.
Why a checklist, and not a timeline
Timelines tell you when things should happen. Checklists tell you what must be true before you allow the next step to start. Factories generally deliver on schedule when the inputs are complete and slip when they are not, and almost every delay we see on a first order comes from a decision that was made late or made twice.
The twelve steps, and what closes each one
| # | Step | What you must produce or confirm | Gate? |
|---|---|---|---|
| 1 | Define the product | Category, fit intent, fabric direction, target FOB, target quantity | — |
| 2 | Screen manufacturers | Three to five candidates who genuinely run your category | — |
| 3 | Send an enquiry brief | One-page brief: style description, quantity, target price, delivery window | — |
| 4 | Review quotations | Line-by-line comparison, not a single FOB number | — |
| 5 | Agree commercial terms | MOQ, payment structure, Incoterm, lead time, sampling cost | — |
| 6 | Write the tech pack | Sketch, measurements, materials, construction, labels, packaging | Gate 1 |
| 7 | Proto sample | One sample to prove the concept and the construction | Gate 2 |
| 8 | Fit sample and fit rounds | Sample on a live fit model, comments consolidated in one pass | — |
| 9 | Size set | One sample per size, graded from the approved fit | Gate 3 |
| 10 | Pre-production sample | Sample made on bulk fabric with bulk trims | Gate 4 |
| 11 | Bulk production and inspection | In-line check plus final AQL inspection report | — |
| 12 | Shipment and reconciliation | Packing list, commercial invoice, shipping docs, balance payment | — |
The four gates, and what to hold at each
Gate 1 — Tech pack sign-off
A tech pack is not a design file. It is the document that decides what "correct" means for the factory. Sign it off only when it contains measurements with tolerances, named fabrics with a supplier or a reference, stitch and seam specification, and an explicit acceptance standard. If any of those four is missing, production will improvise, and improvisation is what you will pay to correct later.
The most common failure at this gate is specifying measurement points without tolerance. A waistband specified as 68 cm with no tolerance will be argued about. A waistband specified as 68 cm ± 1 cm is a decision.
Gate 2 — Proto approval
The proto exists to prove the construction, not the fit. Approve it on construction and silhouette, and resist the temptation to also use it to finalise fit — that is what the fit sample is for. Mixing the two is how brands end up with five rounds instead of two.
Gate 3 — Size-set approval
The size set is where grading is proven. Approve it by measuring every size against the grade rule, not by trying on the middle size. A grade rule that works on a legging will not automatically work on a jumpsuit with a fixed torso length, and a size set is the cheapest place to discover that.
Gate 4 — Pre-production sample
The PP sample must be made from bulk fabric with bulk trims. Approving a PP sample made from sampling stock is one of the most expensive approvals a buyer can give, because the fabric is the one variable the sample was supposed to test.
What to prepare before you send the first enquiry
Buyers who send the most useful enquiry get the most useful quotation. Prepare:
- A one-page product description — category, silhouette, fabric direction, colour count.
- A quantity estimate per style and per colour, not a total.
- A target FOB that you know is realistic for the category.
- A launch date, stated as the date you need goods in hand, not the date you would like them.
- Any non-negotiable — certification, a named fabric mill, a packaging standard.
That is roughly one page. It is enough for a manufacturer to tell you whether the order is feasible and what the real risks are, which is more valuable at this stage than a precise price.
The three things buyers most often get wrong
| Mistake | What it costs | How to avoid it |
|---|---|---|
| Approving a sample visually only | Bulk measurement disputes, rework, air freight | Measure the approved sample and write the numbers into the tech pack |
| Consolidating fit comments across several rounds | Extra sampling rounds, lost weeks | Collect comments once, prioritise them, send as a single marked set |
| Treating the quotation as one number | Paying for scope you did not ask for, or missing scope you did | Compare quotations line by line — fabric, CM, trims, packaging, freight |
A realistic first-order calendar
For a first order of 300 to 1,000 pieces across two styles in activewear or down outerwear, plan for 90 to 120 days from tech pack sign-off to goods in hand. Of that, roughly 15 to 20 days is sampling and approval, 30 to 45 days is bulk production, and the balance is material lead time and shipping. Compressing sampling is the most common way brands try to save time, and the most common reason the order arrives wrong.
Frequently asked questions
How long does a first OEM order take from enquiry to delivery?
Plan 100 to 130 days in total: three to four weeks of enquiry, quotation and tech pack work, three to four weeks of sampling and approval, four to six weeks of bulk production, and shipping. Repeat orders with an established tech pack run considerably shorter because the sampling stages collapse.
Do I need a tech pack before I approach a factory?
No. A one-page brief is enough to start a conversation and get a feasibility opinion. But you do need a tech pack before sampling begins, and you should expect to write it with input from the factory on construction feasibility.
How many sample rounds should I budget for?
Two fit rounds on a first style is normal, three is common on structured outerwear. Budget for three and treat two as a good outcome. Each round costs one to two weeks and a sample fee.
Can I skip the size set to save time?
You can, and it is the single most common cause of a bulk order that sells badly. Grading errors are invisible on a single sample and only appear when the full size run reaches customers.
Who owns the tech pack?
You do, and you should keep a copy. A tech pack that lives only in a factory file cabinet makes it hard to move production or run a second source, and second sourcing is your main commercial protection.
Working through a first order and want a second opinion on your tech pack before sampling starts? Send us your brief and we will come back with a feasibility opinion within two working days.