Sourcing Guide: Buying Activewear and Down Outerwear from a Manufacturer

Choosing Between Full Package and CMT Manufacturing for Apparel

Choosing Between Full Package and CMT Manufacturing for Apparel

Quick answer: In full package (also called FOB or OEM), the manufacturer sources fabric, trims and components, and delivers a finished garment at a single price. In CMT (cut, make, trim), the brand supplies the materials and pays only for conversion. Full package transfers sourcing risk and administration to the factory; CMT gives the brand control over materials and margin but puts sourcing, shipping and material risk on the brand.

The two models, defined precisely

The distinction is about who owns the material sourcing, and everything else follows from it. It is worth stating precisely, because the terms are used loosely in the industry and the boundaries are sometimes negotiated.

Full package (FOB / OEM)CMT (cut, make, trim)
Who sources fabricManufacturerBrand
Who sources trims and componentsManufacturerBrand
What the brand pays forOne price per finished garmentA conversion rate per garment, plus materials separately
Where material risk sitsManufacturer, within the agreed specificationBrand
Typical invoicingSingle FOB invoice at shipmentConversion invoice, plus material invoices to the mill or via the factory
Who handles material defectsManufacturer, as part of the delivered productBrand, against the mill or trim supplier

There is also a middle position, sometimes called semi-full package or material-managed CMT, in which the brand selects and nominates the mill and trim suppliers, and the factory places and administers the orders. This captures much of the convenience of full package while keeping material choice with the brand, and it is common in established brand-supplier relationships.

How cost and margin actually shift

The most persistent misconception is that CMT is cheaper. It is not inherently cheaper — it is differently structured. In full package, the manufacturer buys materials and marks them up as part of the finished price. In CMT, the brand buys materials at its own price and pays separately for conversion. The total may be higher, lower or the same, depending on the brand's purchasing power and how the factory would have priced the materials.

Cost elementFull packageCMT
Fabric costInside the garment price, marked up by the factoryPaid by the brand at its own negotiated price
TrimsInside the garment pricePaid by the brand, often across several suppliers
Conversion costNot separately visibleExplicitly quoted as a rate per garment
Sourcing administrationFactory's cost, embeddedBrand's cost — staff time, mill liaison, sample coordination
Inbound freight to factoryFactory's cost, embeddedBrand's cost
Material wastage and defectsFactory's risk within specificationBrand's risk
Working capitalFactory finances the materialsBrand finances materials, often with deposit
Margin visibilityLow — a single blended priceHigh — conversion rate and material price are both visible

The decisive variable is purchasing power. A brand that reliably orders large volumes and has direct mill relationships may source materials cheaper than the factory can, making CMT genuinely more economical. A brand ordering moderate volumes with no mill relationships will usually find full package better value, because the factory buys fabric continuously and gets better rates and terms than an occasional buyer.

Risk allocation: the part that decides the model

Beyond cost, the models allocate risk differently, and risk is usually the more important consideration. The cost difference between the models is often a few percent; the risk difference is binary — one model leaves the brand holding material it cannot use.

RiskFull packageCMT
Fabric fails a test after purchaseManufacturer resolves it within specificationBrand holds the liability against the mill
Fabric arrives lateManufacturer manages the schedule impactBrand manages the delay and the factory may charge for idle capacity
Fabric quantity shortManufacturer manages the shortfallBrand must re-order, often below mill minimum, at a premium
Shade variation across dye lotsManufacturer manages lot planningBrand manages lot planning and may end up with unusable yardage
Trims incompatible with the care labelManufacturer resolvesBrand resolves across multiple trim suppliers
Quality claim on finished goodsClear: the manufacturer delivered the whole productSplit: is the defect material or workmanship?
Currency movement on materialsLargely manufacturer's exposureBrand's exposure

The last row of the risk table is the one that most often decides the question. In CMT, when a finished garment has a defect, the first dispute is whether the fault lies in the material or in the make. That question is genuinely hard to answer and it is where brand-factory relationships typically degrade. Full package removes the ambiguity by making one party responsible for the delivered product.

The rule that follows from this: if your brand does not have the technical capability to test and accept materials, do not choose CMT. The saving on conversion is smaller than the cost of one rejected fabric lot.

Quality control implications

Quality control is affected in a way that is easy to underestimate. In full package, the manufacturer controls the material from the moment it is ordered, which means material inspection, lot matching and shrinkage verification all happen inside one system, before cutting. Control points are consolidated.

In CMT, the brand must verify and release materials before they enter production, which means either an inspection presence at the factory, a trusted third-party inspection, or an acceptance protocol based on mill test reports. Each has a cost. And because the brand owns the material, any rejected yardage is a write-off against the brand rather than against the factory.

Quality activityFull packageCMT
Fabric inspection on receiptFactory performs it as part of its processBrand must perform it or commission it
Shrinkage and colourfastness verificationFactory, before cuttingBrand, before releasing material to production
Lot matching across the orderFactory plans itBrand plans it with the mill
In-line inspectionFactory, typically includedFactory, but material faults are excluded from its responsibility
Final inspection and AQLAs agreed in the purchase orderAs agreed, with the material/workmanship split caveat
Defect liabilitySingle-party, clearSplit, requires investigation and evidence

Minimum order and flexibility

Minimum order behaviour differs in a way that matters particularly to emerging brands. In full package, the binding minimum is usually the fabric mill's minimum for the colour and construction, and the manufacturer can aggregate your order with others using the same fabric, which effectively lowers your entry point.

In CMT, the brand buys the fabric directly, so the mill's minimum applies to the brand alone. A brand ordering 500 units of a garment in a custom colour may find itself facing a mill minimum of several thousand metres, which is the real constraint — not the factory's conversion minimum. This is the most common reason smaller brands abandon CMT after trying it once.

ConstraintFull packageCMT
Binding minimumFabric mill minimum, often aggregated across customersFabric mill minimum, borne by the brand alone
Effective entry pointLower — factory may already hold the fabricHigher — brand must commit to the full quantity
Colour flexibilityBetter, where the factory runs that fabric continuouslyDependent on the brand's own volume per colour
Small top-up ordersPossible if fabric is in the factory's stockUsually requires a new mill order at a premium
Lead time on repeatsShorter, if fabric is heldFull mill lead time each time

Which model suits which brand stage

Brand situationRecommended modelReasoning
First collection, no mill relationships, moderate volumeFull packageAvoids mill minimums and material risk; the factory's purchasing power is better than the brand's
Growing brand with technical staff and testing capabilitySemi-full packageBrand nominates materials for control and claims; factory administers ordering and carries execution risk
Established brand with direct mill relationships and high volumeCMTMaterial margin accrues to the brand; conversion cost is visible and negotiable
Brand with a strict sustainability or certification requirementSemi-full package or nominated CMTMaterial provenance and certification must be controlled by the brand to be substantiable
Brand selling into regulated markets with passport obligationsNominated materials, either modelComposition and certification data has to be traceable per batch regardless of who buys the fabric
Brand with very small volumes, or frequent small dropsFull packageAggregation and stock access make small volumes viable

How to choose: a decision checklist

  1. Quantify your volume per fabric per colourway. This is the single input that most reliably determines the answer. If your volume per colour is below the mill minimum, full package is usually the only workable route.
  2. Assess your technical capability honestly. Can you inspect incoming fabric, verify shrinkage and colourfastness, match lots and release material to production? If not, CMT imposes a capability you do not have.
  3. Establish whether the cost difference is real. Ask the same factory to quote both ways, including materials, for the same specification. The gap is often smaller than expected and frequently reverses once administration is included.
  4. Decide who should carry material risk. This is a strategic choice, and it should be made deliberately rather than as a side effect of a price comparison.
  5. Consider claims and compliance. If the brand makes recycled content, organic or traceability claims, someone has to hold the certification per batch. Either the factory does it as a service, or the brand does it in-house.
  6. Test with one style before committing the range. Run a single style through the chosen model and measure the real administrative load. That measurement is far more informative than a cost model.
  7. Write the boundary into the purchase order. Whatever model you choose, state who sources what, who inspects what, who bears what risk, and what documentation is delivered with the goods.

Frequently asked questions

Is CMT always cheaper than full package?

No. CMT removes the factory's markup on materials, but it adds the brand's sourcing administration, inbound freight, material risk and working capital cost. Whether the net effect is a saving depends almost entirely on whether the brand's purchasing power for materials exceeds the factory's — which for most small and mid-size brands it does not.

Can I switch from full package to CMT later?

Yes, and it is a common progression as a brand grows and its technical capability develops. The practical prerequisites are volume per colourway that clears mill minimums, the ability to inspect and release materials, and enough working capital to pay for materials ahead of production. Brands that move too early usually move back.

Who owns the intellectual property in each model?

The model does not determine IP ownership; the contract does. In both cases the brand should have a written agreement covering the design, the pattern, the tech pack and any custom trim or print artwork. Full package sometimes leads brands to assume the factory owns the pattern it developed — that should be settled explicitly, in writing, before the first order.

How does the choice affect lead time?

Full package is usually faster for repeats because the factory controls material availability and can hold stock. CMT typically adds the mill lead time to every order cycle, because materials are sourced afresh. For brands with frequent drops, this difference is often more significant than the cost difference.

What is the safest option for a brand making sustainability claims?

Either model works, but the brand must control the evidence. In practice this means nominating the material supplier and requiring certification and lot references to be passed through with each batch, rather than relying on the factory to source to a specification. If the factory sources the material, the purchase order must state that certification and composition records are a deliverable.

How should the purchase order reflect the choice?

State the model explicitly, list which party sources each component, define the inspection points and who performs them, assign liability for material versus workmanship defects, and specify the documentation delivered with the goods. Ambiguity in these five areas is what turns a workable relationship into a dispute.

Related reading

Price structure differs considerably between the two models. See how to read a quotation and compare suppliers properly.

How to read a garment quotation

Related reading

See the realistic timeline from sample to bulk production.

How to Write an Apparel Tech Pack That Prevents Costl...

Related reading

See how to run a factory audit and a pre-shipment inspection.

Fabric Consumption and Costing: How to Read a Garment...

Not sure which model fits your stage?

We quote both ways for the same specification so you can see the real cost and risk difference rather than a theoretical one. Tell us your volumes per colourway and your target markets, and we will advise on the model that fits.

Compare both models

OEM Apparel Order Checklist: 12 Steps From First Enquiry to Delivery
Fabric Consumption and Costing: How to Read a Garment Quotation