دليل الشراء: شراء الملابس الرياضية والسترات المبطنة من مصنع

Fabric Consumption and Costing: How to Read a Garment Quotation

Fabric Consumption and Costing: How to Read a Garment Quotation

Quick answer: A garment quotation has four cost blocks — fabric and trims, cut-make-trim (CM), packaging and labelling, and commercial overhead plus margin. The two lines buyers should interrogate are fabric consumption and the CM rate, because they are the largest and the most comparable. Consumption is driven by marker efficiency, which is why small size-curve changes can move the price more than expected.

Why quotations are hard to compare

Two suppliers quoting the "same" garment at different prices are rarely quoting the same thing. The difference is usually not margin, and it is rarely dishonesty. It is the underlying assumptions: how much fabric was allowed, what wastage was assumed, what the size ratio was, whether trims were priced at the specification or at a placeholder, and whether the quoted CM covers the finishing and inspection that the brand actually needs.

Reading a quotation properly means reconstructing those assumptions. Once the assumptions are visible, price differences become explainable, and negotiation becomes about specific assumptions rather than a percentage.

Block 1: fabric and trim cost

Fabric is normally the largest single line, and it is the one with the most hidden variance. Fabric cost per garment equals consumption multiplied by the fabric price per unit of length or weight, and both factors carry assumptions.

Consumption: how it is calculated

Consumption is the area or length of fabric required to produce one garment, including the wastage that arises from cutting. It is normally derived from a marker — the layout of pattern pieces across the fabric width — and expressed either as length per garment or as weight per garment for knitted fabrics sold by weight.

InputEffect on consumptionQuestions to ask
Marker efficiencyHigher efficiency means less fabric per garmentWhat marker efficiency percentage was assumed? Is it verified on the actual fabric width?
Fabric widthA wider fabric can improve efficiency or worsen it, depending on the patternWhich fabric width was used for the calculation? Does it match the specified fabric?
Size ratio in the orderLarger sizes consume more fabric disproportionatelyWhat size ratio was assumed, and does it match the planned order?
Pattern shape and seam allowanceMore complex panels reduce efficiencyWere seam allowances and any panel asymmetry included?
Directional or one-way fabricNap, print direction or shading can prevent efficient nestingIs the fabric directional? Was a one-way constraint applied to the marker?
Elastic and stretch behaviourRelaxation can change cut dimensionsWas the consumption calculated on relaxed or greige dimensions?

The size-ratio trap. Consumption is normally quoted on a standard size ratio. If your actual order skews to larger sizes — which is common in North American and European markets — the real consumption is higher than the quoted figure, and the price will be adjusted. This is a legitimate adjustment, not an error, but it should be established before the order, not after. Confirm the size ratio used in the quotation and compare it with your planned order breakdown.

Fabric price: what is inside it

ComponentNotes
Base fabric priceDepends on fibre, weight, construction, finish and order quantity
Dyeing and finishingOften quoted separately from greige; dye-lot minimums apply
Minimum order surchargeApplies when the order is below the mill minimum for the colour or construction
Testing and certificationFabric test reports and certification carry a cost, sometimes absorbed, sometimes billed
Freight to the factoryMills are not always local to the garment factory; the gap is a real cost
Shrinkage allowanceFabric pre-shrunk for the garment costs more than untreated yardage

The important discipline is to ask which of these are inside the quoted fabric price. A quote with dyeing excluded will look cheaper and will not be, and it will also disrupt the price comparison against other suppliers.

Block 2: the CM line

Cut-make-trim — sometimes written as CM or CMT, and sometimes as a full-package price — covers the conversion of materials into a finished garment. It is the block where suppliers compete most visibly, and where comparability is easiest if the scope is pinned down.

CM cost driverEffectHow to interrogate it
Number of sewing operationsThe primary driver of labour timeAsk for the operation count for the style
Machine type and special equipmentSpecialist machines raise the rateWhich operations need special or single-purpose machines?
Cycle time per garmentDirectly multiplied by the labour rateAsk for the target cycle time in minutes
Finishing and pressingVaries with fabric and product typeIs finishing included, and how many press operations?
Inspection and qualityOften partially excludedIs inline and final inspection included, and to what AQL?
Thread, needle and sundriesNormally included in CMConfirm thread is in CM and not billed separately
Sampling costMay be included or charged separatelyAre sample fees refundable, and under what conditions?

The most frequent comparability problem in the CM line is scope. One supplier includes pressing and inspection; another quotes them separately. The headline numbers then differ by more than the real cost difference, and the comparison misleads. Our guide to sampling policy and sample fees covers how the development cost side of this is normally structured.

Block 3: packaging, labelling and logistics

This block is small in absolute terms but high in surprise potential, because it is where specification changes land. A change from a simple polybag to a retail-ready box, or the addition of a hangtag and a heat-transfer neck label, can move this line substantially while leaving fabric and CM untouched.

ItemCost behaviourNote
Care and content labelsLow unit cost, but artwork and language sets add setupLanguage requirements differ by market; a multi-market label is cheaper than several single-market runs
Woven or printed main labelHigher for woven; heat transfer sits betweenOrder quantity drives the price per label significantly
Hangtags and any secondary tagsModerate, often overlooked in early quotesAsk whether they were included
Polybag and cartonLow per unit, but dimension errors cost real moneyCarton size affects freight volume and therefore total landed cost
Packing operationLabour time per garmentFlat packing is faster than folding to a retail standard with inserts
Export documentationFixed or per-shipment costConfirm whether it is billed per order or per shipment

Block 4: overhead, margin and commercial terms

The final block covers the factory's indirect costs and profit. It is usually expressed inside the CM rate rather than as a separate percentage, which is why asking for a margin figure often produces a blank look. The practical approach is to interrogate the commercial terms that are visible rather than the margin that is not.

  • Payment terms: deposit percentage, balance trigger, and whether the deposit is against order confirmation or against production start.
  • Incoterm: EXW, FOB, CIF or DDP — each shifts cost and risk, and the quoted price is meaningless without it. Our guide to shipping terms explains what each transfers.
  • Quantity tolerance: the percentage over or under the ordered quantity the factory may ship, which is standard practice in textile production.
  • Price validity period: how long the quote holds, and what events — raw material movement, exchange rate — allow a re-quote.
  • Price break structure: whether a higher order quantity earns a genuinely lower price or only a nominal discount, and at what thresholds.
  • Currency: which currency the price is fixed in, and who carries the exchange risk.

A worked comparison framework

The following structure makes quotations directly comparable. It is deliberately explicit, because the act of filling it in for each supplier reveals the scope differences that a headline price conceals.

LineUnitSupplier ASupplier BNotes
Fabric consumptionm or kg per garmentAsk for marker efficiency and size ratio assumed
Fabric unit priceper m or per kgConfirm whether dyeing and finishing are included
Fabric costper garmentConsumption × unit price
Lining and interliningper garmentFrequently omitted from first quotes on lined garments
Trims and hardwareper garmentPriced at specification, or placeholder?
Cut-make-trimper garmentAsk for operation count and cycle time
Finishing and pressingper garmentOften quoted separately — normalise before comparing
Inspectionper garmentConfirm AQL and whether inline is included
Labelling and packagingper garmentConfirm polybag, hangtag, carton specification
Sample and developmentper orderRefundable? Under what condition?
Total FOBper garmentState the Incoterm and port

Normalise before you compare. Move every separately quoted service into the total, on both sides. A supplier who quotes a lower fabric cost but bills pressing separately is not cheaper — the comparison only becomes valid once both are expressed on the same scope. This single step resolves most apparent price differences.

Which lines are genuinely negotiable

Negotiation works where there is structural flexibility, and fails where there is not. The following assessment reflects where movement is usually available.

LineNegotiable?Lever
Fabric unit pricePartiallyOrder quantity, colour consolidation, accepting a standard construction instead of a custom one
Fabric consumptionYes, structurallyImproving marker efficiency, adjusting fabric width, simplifying panel shapes, accepting a print repeat that nests better
CM labourLimitedReducing operation count through design simplification; increasing quantity per colour
TrimsYes, sometimes substantiallySwitching from a woven to a printed label, standardising hardware across styles, consolidating trim suppliers
PackagingYesSpecifying flat pack instead of retail fold, right-sizing cartons
Overhead and marginRarely directlyInfluenced by volume commitment, payment terms and order predictability

The most productive negotiation is usually on consumption and trims, because both are structural rather than rate-based. A small change to panel layout or fabric width can reduce consumption more than a percentage negotiation on the fabric rate would achieve, and it does not require the mill to accept a lower price.

Frequently asked questions

Why did my price change between quotation and order confirmation?

The usual causes are the size ratio actually ordered versus the one quoted, a fabric price adjustment for the confirmed colour or construction, or trims that were priced as placeholders and later specified in full. All three are legitimate if they were flagged in the quotation. Ask for the assumption list at quote stage so the adjustment is expected.

What marker efficiency should I expect?

It varies enormously with pattern shape, fabric width and whether the fabric is directional. Simple, compact panels in a solid non-directional fabric achieve high efficiency; long, shaped panels in a one-way print can be far lower. Rather than a target number, ask what efficiency was assumed and whether it was verified against the actual fabric width and constraints.

Is a fabric consumption figure quoted per metre or per kilogram better?

It depends on how the fabric is traded. Wovens are usually traded by length, so consumption per metre is comparable. Knitted fabrics are frequently traded by weight, in which case consumption per kilogram is the relevant figure, and it must reflect the finished fabric weight after dyeing and finishing rather than greige weight.

Should I ask a supplier to reveal their margin?

It is rarely productive. Margin is normally embedded in the CM rate, and a direct question tends to produce a defensive answer rather than information. Interrogate the terms that are visible — payment terms, price validity, quantity tolerance, price break thresholds — and negotiate on the structural cost lines instead.

How can I reduce cost without changing the design?

Three levers usually remain: improve marker efficiency by adjusting fabric width or permitting a different nesting arrangement, consolidate colourways to reduce dye-lot and minimum charges, and simplify packaging from retail-ready to flat pack. Each is a real saving that does not touch the product the customer sees.

Does a higher quantity always mean a lower unit price?

Not uniformly. The price falls steeply across the mill minimum for fabric and the machine minimum for the CM line, then flattens. Beyond a certain point, additional volume brings only marginal reduction. Ask for the price break thresholds explicitly, because ordering well past the last meaningful break adds inventory cost without a corresponding unit price benefit.

Related reading

Consumption and cost are settled long before production starts. See what makes a specification complete enough to quote accurately.

How to write an apparel tech pack

Related reading

See the realistic timeline from sample to bulk production.

How to Write an Apparel Tech Pack That Prevents Costl...

Related reading

See how to read a garment quotation line by line.

Choosing Between Full Package and CMT Manufacturing f...

Want a quotation you can actually compare?

We quote with the assumptions stated — marker efficiency, size ratio, fabric width, trim specification and the inspection standard included — so you can compare like with like across suppliers. Send your tech pack and target quantities.

Request a transparent quote

Choosing Between Full Package and CMT Manufacturing for Apparel
How to Write an Apparel Tech Pack That Prevents Costly Rework